Second phase of drilling unearths new WA phosphate target
DIVERSE metals explorer Phosphate Australia has reported strong results from the second phase of drilling at its Tuckanarra gold project. The Tuckanarra mine lies within WA’s Murchison goldfield, and has historic production of about 125,000 ounces. The Phase 2 aircore (AC) drilling program at Tuckanarra comprised 215 holes for a total of 5070m of drilling, primarily targeting shallow laterite mineralisation at the project’s Cable East, Cable West, Drogue, Bollard and Anchor deposits. Drilling was completed in February, and identified mineralisation in all of the targeted deposit areas. Drilling at Cable East upgraded the strike length of the deposit to about500m, open at depth, with drilling returning results including 12m at 3.28 grams per tonne gold from 16m to end-of-hole. The...